I had problems related to the part loading and the downtime of tool changes; to perform all the machining of the part I had to equip several machines.
Now, I load the part on the free pallet, while the units are working.
The positive results achieved with PORTA Production Method are the significant reduction in production times and tooling times and more precision.
Eng. Marco Stradiotti
Production Manager
KRAMER ITALIA S.r.l.
Via Matteotti 1 – 13864 Crevacuore (BI) – Italy